The Trane XR202 (TCONT202) is a programmable push-button single-stage thermostat with a 3.5-inch backlit display for heat/cool systems up to 1H/1C. It supports 7-day, 5-1-1 scheduling, temporary overrides, early start, filter reminders, and keypad lock. Below are the key specifications and operation instructions.
1. Install Batteries: Insert 2 AA alkaline batteries; remove tag.
2. Set Time/Date: Press Set Time; adjust hour/minutes/day with arrows; press Exit.
3. Set Mode/Fan: System switch: Heat/Cool/Off; Fan: Auto/On.
4. Schedule Type: User Menu > 01: Select 7-day, 5-1-1, or non-programmable.
1. Display: Time, room temp, setpoint, day, battery, status icons.
2. Controls: Arrows for setpoint/override; Hold for permanent; Menu for options; Backlight button.
3. Indicators: Heat On/Cool On; Hold; Lock; Low battery; Filter reminder.
1. Heat: System to Heat; setpoint above room; activates after delay.
2. Cool: System to Cool; setpoint below room; compressor after 5-min lockout.
3. Off: No operation.
4. Auto: Changeover supported.
5. Fan: Auto (with calls) or On (continuous).
1. Access: Press Menu > Settings.
2. Options: Schedule type, early start, °F/°C, temp adjustment (±5°F), display light, filter reminder (1-12 months).
3. Schedule Edit: In Heat/Cool, Menu > Next; adjust periods P1-P4 for days.
4. Installer Menu: Hold Menu 8s for cycle rates, lockout, limits.
1. Scheduling: 4 periods/day; 7-day or 5-1-1; factory defaults provided.
2. Overrides: Temporary (2+ hrs), permanent Hold.
3. Early Start: Pre-heats/cools to reach setpoint on time.
4. Keypad Lock: Hold up arrow + Menu.
5. Compressor Protection: 5-min off timer.
Warning: Qualified personnel only. Disconnect power. Follow lockout/tagout.
Terminal Designations:
| Terminal | Description |
|---|---|
| RC | 24V Hot (Cooling) |
| RH | 24V Hot (Heating) |
| W | Heat Stage 1 |
| Y | Compressor Stage 1 |
| G | Fan |
| O/B | Reversing Valve |
| C | Common |
Notes: Factory jumper RC/RH (clip if separate); Gas/Electric switch; O/B to O (default) or B. Jumper Y-W for heat pump. Specific diagrams for various Trane systems.
Estimate monthly energy savings from scheduling (assumes 3°F setback saving 0.15 kWh per hour unoccupied; 30 days/month).